|cooling tower water treatment|cooling tower water treatment|process water filtration|industrial water filtration systems In a variety of applications such as evaporative cooling (side stream filtration), industrial HVAC towers water filtration (water reuse), processing, potable water and swimming pools.

In industrial HVAC towers water filtration applications, there is a great need to cut the operating cost in order to improve factory competitiveness. Electricity spent in HVAC/HVIC is definitely the biggest portion as a whole (around 65%). Savings realized with the use of a VORTISAND filter, payback period could be less than 12 months. Contact us for a payback calculation estimate.

Our experience of industrial HVAC towers water filtration systems shows that it takes, as a general rule of thumb, 30 to 40 filtrations of the system volume to clean up the water. This should not be considered as exact science because particular conditions like the nature of the contamination, the thickness of the fouling on the metal surfaces, recirculation flow, the chemicals used, etc. can affect the time required for cleaning the water.



industrial_HVAC_towers_water_fil |
cooling tower water treatment | process water filtration | centrifugal separator | industrial water filters | cooling water filtration | RO pretreatment | cooling tower filtering | cooling water filter | industrial HVAC towers water filtration | sidestream filtration | water centrifugal separators | side stream filtration | hvac water filter | cooling tower filtration | centrifugal water separators | HVAC tower micron water filtration | cooling tower sand filter | cooling tower filter | industrial water filter | industrial water filtration systems |